What Cloud Migration Covers

Cloud migration is more than “lift and shift”. A migration worth doing improves cost, reliability, and delivery speed. One done without a plan frequently increases all three. We plan and execute migrations that hit the business goal behind the move, not just the checkbox.

Assessment & Migration Plan

We inventory every application, dependency, and dataset. Each workload gets a recommended migration pattern — rehost, replatform, refactor, or retire — with cost estimates and risk ratings.

Target Architecture

Right-sized target architecture on AWS, GCP, or Azure — using managed services where they pay off, avoiding them where they don’t. Infrastructure as code from day one.

Zero-Downtime Cutover

Parallel environments, dual-writes, cut-over windows, and rollback plans so production keeps running through the migration. No heroic weekends.

Key Deliverables

  • Current-state inventory and assessment report
  • Migration plan with timeline, cost, and risk estimates
  • Target cloud infrastructure (IaC, CI/CD, observability)
  • Executed migration with zero-downtime cutover
  • Post-migration cost and performance review

Business Benefits

  • Lower total infrastructure cost through right-sizing and automation
  • Better reliability and scalability for customer-facing systems
  • Faster feature delivery on a modern platform
  • Compliance posture aligned with current cloud standards

How We Work

  1. Assess — Inventory, dependencies, cost baseline, risk map.
  2. Plan — Per-workload migration pattern, timeline, budget.
  3. Prepare — Target environment, IaC, observability, cut-over runbooks.
  4. Migrate — Workload by workload with rollback safety nets.
  5. Optimise — Cost, performance, and automation after landing.

Our Extremely Honest FAQ

Is cloud actually cheaper?

Not by default. Cloud is cheaper when you use it well — right-sized, autoscaled, managed services where they help. We’ll show you the actual numbers for your workloads in the assessment.

Which cloud provider should we pick?

Depends on your stack, compliance needs, and existing tooling. All three are capable. We’ll recommend based on your constraints, not a preferred vendor.

How long does a migration take?

Small setups: 6–12 weeks. Enterprise migrations: 6–18 months, executed in waves. The assessment produces a concrete timeline for your specific case.